Banner Supply Lift Station and Force Main Extension

Project Area: 2000 FT Along US41
Project Value: $96,000
Date Completed: 08/04/2009
The James Group, LLC

Miami, FL


Project Services

  • C.E.I. Services
  • Construction Management
  • Engineering
  • General Construction
  • Municipal Permitting
  • Utility Design

Project Photos

(click on image to enlarge)

Aerial of Project Site
Plan and Profile View of Force Main Extension

Project Description

Project Engineer and Construction Manager for the design and construction of 1,806 LF of wastewater force main along US41 in Gibsonton, Florida. The project required the coordination of existing utilities along the FDOT Right of Way, negotiation of an existing consent order, conversion of an existing pump station, and abandonment of existing wastewater treatment plant. The project was designed, permitted thru HC PGMD, HC EPC and FDOT; and constructed in 2007.