Banner Supply Lift Station and Force Main Extension
| Project Area: | 2000 FT Along US41 |
| Project Value: | $96,000 |
| Date Completed: | 08/04/2009 |
Miami, FL
Project Services
- C.E.I. Services
- Construction Management
- Engineering
- General Construction
- Municipal Permitting
- Utility Design
Project Description
Project Engineer and Construction Manager for the design and construction of 1,806 LF of wastewater force main along US41 in Gibsonton, Florida. The project required the coordination of existing utilities along the FDOT Right of Way, negotiation of an existing consent order, conversion of an existing pump station, and abandonment of existing wastewater treatment plant. The project was designed, permitted thru HC PGMD, HC EPC and FDOT; and constructed in 2007.